Qualcomm and Teleepoch
Enter Into a 3G CDMA Subscriber Unit License Agreement, October
6, 2007
MTN chooses Cambridge Broadband
Networks for multi-service wireless network in Rwanda, October 6,
2007
Brazilian government to
publish 3G bidding rules soon, October 6, 2007
KTF 3G service suffers
from technical problems, October 6, 2007
Argentina’s Personal
lunches 3G service in Rosario, October 6, 2007
Russia has it's first 3G
network, October 6, 2007
AT&T could drop Alcatel-Lucent
as 3G mobile network supplier, October 6, 2007
Enea Extends License Agreement
with ZTE for 3G Handsets, October 2, 2007
LG to unveil premium handsets
in Brazil, October 2, 2007
KTF 3G subscribers doubled
in less than 3 months, October 2, 2007
3G policy in India will
be non-uniform, October 2, 2007
- previous news
|
|
New Traffic Planning and QoS Validation Platform Reveals True Dynamic
UMTS Behavior
April 10, 2003
Radioplan, a provider of network planning, optimization, and measurement
analysis solutions, announced the release of WiNeS 1.4, a software platform
for third-generation (3G) network validation and optimization. WiNeS is
a fully GIS-enabled and a platform that enables network operators to efficiently
investigate the network configuration data and QoS results obtained by
emulating the entire radio access network behavior over time. The integrated
dynamic UMTS simulation engine supports all the technical features required
for the verification and QoS validation of any currently deployed UMTS
network.
WiNeS now comprises unparalleled visualization and analysis functions.
In particular, the wide range of dynamics in a 3G network such as the
“snow ball effect” due to Compressed Mode can be inspected in an animated
“slide show” of the results. They enable the user to understand the true
behavior of a UMTS network. Such knowledge is vital for successful network
operation. In conjunction with a seamless integration with the latest
version of Forsk’s ATOLL network planning system, the WiNeS Platform is
the ideal solution for traffic planning, coverage/capacity planning verification,
and reliable QoS validation of 3G radio networks.
The WiNeS Platform is being tested and evaluated at leading European
3G network operators. The complete integration into the network planning
and optimization processes is ensured by automated data exchange interfaces
with common planning tools and existing database systems.
|